Closing design validation without repeat testing
A medical device manufacturer needed material declarations for a cable assembly before validation could be signed off. The previous supplier could not provide them.
Read case studyApplication problems we have solved, described honestly — what failed, why it failed, and what the replacement actually changed. Each study links back to the parts involved.
A medical device manufacturer needed material declarations for a cable assembly before validation could be signed off. The previous supplier could not provide them.
Read case studyCables on a six-axis robot wrist were being replaced every three to four months. The fix was a construction change and a routing change, not a…
Read case studyA research cluster had run out of switch ports but not rack space. Stacked 400G connectors solved the constraint without a chassis refresh.
Read case studyA semiconductor handler needed a high-cycle board interface that the original supplier had discontinued. The alternative was a fixture redesign — until we found a drop-in…
Read case studyA Camera Link cell started dropping frames after new drives were installed nearby. The camera, the frame grabber and the software were all blamed before the…
Read case studyA high-cycle packaging axis was throwing encoder alarms every few weeks. The cause was not the drive — it was the pair geometry of the replacement…
Read case studyDescribe the failure and we will tell you honestly whether it is an interconnect problem — and what we would change.
Send us your drawing, part number or application details and our engineering team will come back with a specification, lead time and quotation — usually within a few hours.